Works to repair eroded bank on River Roe in Limavady to take place this summer

Works to repair an eroded bank on the River Roe in Limavady are to get underway this summer, roads minister Liz Kimmins has said.

The Minister said her department’s officials had inspected the bank and the nearby Roe New Bridge on the Limavady Bypass but did not find any issues with the span across the river.

She was asked about the bridge and the eroded river bank by DUP MLA Alan Robinson.

"I am aware of recent media reports relating to riverbank erosion upstream of Roe New Bridge on the Limavady Bypass. My officials undertook an inspection of the bridge and riverbanks on April 14, which did not identify any issues affecting the structure.

An eroded bank on the River Roeplaceholder image
An eroded bank on the River Roe

“The area of bank erosion is remote from the bridge, with works to repair the affected embankment expected to commence this summer.

“In the interim, my officials will continue to monitor the extent of riverbank erosion and implement measures to protect the structure should it be necessary,” she stated.

Related topics:
News you can trust since 1772
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice