Minister to probe gritting near Lisneal College
The Infrastructure Minister made the announcement on Thursday morning, as the region awoke to sub-zero temperatures.
Chris Hazzard said: “This section of the road is not currently gritted; however I have asked my officials to carry out a traffic survey to establish if traffic volumes are sufficient to justify gritting.
Advertisement
Hide AdAdvertisement
Hide Ad“Lisneal College is served by an adopted road through Summer Meadows, which is currently maintained by Transport NI and the street lighting is operating satisfactorily.”
He added: “I would call on the developer to ensure the safety of those using the unadopted section of the road which is also used by students to access the school.”